Uploaded image for project: 'translate5'
  1. translate5
  2. TRANSLATE-3731

Empty projects shows tasks of previous project

    XMLWordPrintable

Details

    • High
    • If due errors only a project is created but no tasks belonging to it, then the task list of such project behaves strange.

    Description

      problem

      It may happen in very seldom cases, that on import no task was created but the project was.

      In that case when clicking through the projects, the tasks in the task grid remains of the previous selected project after selecting such an empty project.

      In that case the task grid should be emptied, if possible with in the grid, also the "internal" selected task for which the data is loaded in the lower tab panel on the right.

      reproduction

      Delete manually the task of a project in the DB.

      Attachments

        Activity

          People

            pavelperminov Pavel Perminov
            tlauria Thomas Lauria
            Aleksandar Mitrev
            Votes:
            0 Vote for this issue
            Watchers:
            1 Start watching this issue

            Dates

              Created:
              Updated:
              Resolved: